PennDOT Arterial Bypass Highway Study 2018

Road Department

July 16, 2018
  • PDF
  • 2 MB

Download

PennDOT has held a few public meetings for the Route 6 Asset Management & Corridor Improvement Study covering the French Creek Parkway, located within the City of Meadville and West Mead Township.  They obtained feedback from residents, commuters, local business owners and others regarding the future of the four lane divided highway.  The final report is being reviewed with four different options being considered.  Please let PennDOT know what you prefer as they are considering four options including keeping the existing four lanes or downsizing into two lanes with the possibility of a bike/walking trail.  The study is available online at www.penndot.gov and a link is also available by using the link below.

SR 6 19 Public Meeting Presentation

Close window