Document Types: Master Plans

French Creek Entertainment District Plan 2018 Part 1 of 2

PennDOT will be downsizing the French Creek Parkway (also referred to as the arterial or bypass) from an exiting 4 lane highway to a 2 lane roadway with a trail system on the remaining lands.  Work is set to begin in 2024 and be completed by 2025.  This document was presented at the same time … Continued

French Creek Entertainment District Plan 2018 Part 2 of 2

PennDOT will be downsizing the French Creek Parkway (also referred to as the arterial or bypass) from an exiting 4 lane highway to a 2 lane roadway with a trail system on the remaining lands.  Work is set to begin in 2024 and be completed by 2025.  This document was presented at the same time … Continued

Arterial Bypass Road Diet June 2018

PennDOT will be downsizing the French Creek Parkway (also referred to as the arterial or bypass) from an exiting 4 lane highway to a 2 lane roadway with a trail system on the remaining lands.  Work is set to begin in 2024 and be completed by 2025.  This document contains the second proposal with changes … Continued

Arterial Bypass Road Diet January 2018

PennDOT will be downsizing the French Creek Parkway (also referred to as the arterial or bypass) from an exiting 4 lane highway to a 2 lane roadway with a trail system on the remaining lands.  Work is set to begin in 2024 and be completed by 2025.  This document contains the original proposal with four … Continued